Tanka Engineers LLP has delivered the Altyn Tor Gold Recovery Plant at Solton-Sary, in the Kyrgyz Republic The plant was inaugurated online on 12 September 2026 by HE Sadyr N Japarov, President of... more
Tanka Engineers LLP has delivered the Altyn Tor Gold Recovery Plant at Solton-Sary, in the Kyrgyz Republic The plant was inaugurated online on 12 September 2026 by HE Sadyr N Japarov, President of... more
© Copyright 2020–2026 Tanka Engineers LLP. | Blogs